Contact us
- : 0086-371-86151627 0086-371-86151827
- : 0086-371-86011881
- : [email protected]
- : [email protected]
- : bebonchina
Products- Boiler steels
- High carbon steel
- High Yield steel
- steel for welded tubes
- General construction steel
- steel with Cr.,Mo.,Cr-Mo
- Steel for large diameter pipes
- Simple pressure vessels steel
- Steel for gas cylinders and gas vessels
- General purpose structural steels
- Steel for boilers and pressure vessels
- steel resistant to atmospherical corrosion
- Carbon steel and low alloy steel
- Fine-grain structural steels,normalised rolled
- weldable normalized fine grained pressure vessel steels
News- Heavy-Forging Thick Steel Plates for
- Marine-Grade Thick Steel Plates for
- Storage Tank Thick Steel Plates for
- Seismic-Resistant Thick Steel Plates
- Extra-Wide Thick Steel Plates for La
- Clad Thick Steel Plates with Stainle
- HIC-Resistant Thick Steel Plates for
- Low-Temperature Thick Steel Plates f
- Thick Steel Plates for Offshore Wind
- Thick Steel Plates in Cement Product
Heat Treatment Process of 12Cr1MoV steel
The creep limit of 12Cr1MoV steel is similar to the value of enduring strength. It has high plasticity when it is stretched for a long time, and the thermal strength of 12Cr1MoV steel is good. Since 12Cr1MoV steel still has high thermal strength and oxidation resistance at 580°C, it can be used in manufacturing work Overheated steel pipes, conduits, radiator pipes and related forgings in high-pressure equipment with a temperature not exceeding 580°C.
The preparations and conditions before the heat treatment of 12Cr1MoV steel are as follows:
A.Prepare the heat treatment plan for 12Cr1MoV steel, and operate after
approval;
B. The orifice plate, thermometer and other instruments near the 12Cr1MoV steel weld on the pipeline should be completely removed, and the removal port should be protected;
C. Electric heaters, thermocouples, recorders and other equipment used in the heat treatment of 12Cr1MoV steel should be intact;
D. All measuring instruments and electrical equipment should be qualified and within the validity period;
E. When welding outdoor pipes of 12Cr1MoV steel, a reliable weatherproof shed should be erected.